Floor and tiles installation

Floor and tile installation for villas, apartments, offices, and retail. Porcelain, ceramic, marble, granite, SPC, and outdoor pavers with laser levelling and neat detailing.

Book

About

Floor and tile installation for villas, apartments, offices, and retail. Porcelain, ceramic, marble, granite, SPC, and outdoor pavers with laser levelling and neat detailing.

  • Substrate rectification: grinding, patching, and self-levelling
  • Layout patterns: stack, brick, herringbone, and diagonal
  • Thresholds, trims, and skirting
  • Wet rooms: waterproofing, slopes, and drain detailing
  • Epoxy, UV-stable, and colour-matched grouts
  • Night and weekend scheduling when needed

Why this service

Level and alignment

Laser checks and levelling compounds for flat planes and even grout lines.

Experienced installers

Manufacturer data sheets and local standards followed.

Quality materials

Adhesives, primers, and grouts matched to tile, substrate, and traffic.

On-time delivery

Phased scheduling and after-hours work when the programme needs it.

How it works

  1. Survey and quotation

    Measure areas; check flatness and moisture; agree specification and timeline.

    • Moisture and level checks
    • Pattern mock-up and cut strategy
    • Risk assessment and protection plan
  2. Substrate prep

    Grind highs, fill lows, prime; crack isolation where needed.

    • Self-levelling for flat planes
    • Bonding primers suited to substrate
    • Expansion joints maintained
  3. Set-out and dry-lay

    Chalk lines and grid for balanced perimeter cuts; complex patterns dry-laid.

    • Centring for symmetry
    • Herringbone and diagonal alignment
    • Trim and threshold coordination
  4. Adhesive and laying

    Correct trowel size; back-butter large formats; spacers and levelling clips.

    • Lippage control on large formats
    • Wet-area waterproofing and slopes
    • Consistent joint widths
  5. Grouting and detailing

    Epoxy or cement grout; stone sealed where needed; silicone at movement joints.

    • Colour-matched grout and silicones
    • Edge trims and skirting
    • Initial clean and haze removal
  6. Handover and care

    Final inspection, snags closed, care guidance for cleaning and sealing.

    • Warranty and maintenance guide
    • Protection options during fit-out
    • Area left walkable

Customers

Marble lobby level with straight joints; nights worked; site kept clean.

Hind A., Downtown Dubai

Porcelain herringbone with balanced cuts and no lippage.

Samir K., Arabian Ranches

Bathroom tiles sealed and sloped correctly; schedule held.

Lea M., JLT